Post by
kevinphan »
https://forums.nicoclub.com/kevinphan-u97445.html
Sun Jan 11, 2009 6:23 pm
Wow bringing this back from the dead haha, I basically gave up on the project well not really I just put it on the back burner for a long time heres a summed up version of the past few months, girlfriend broke up with me, got back together, quit my job, worked at my parents, towed the car back from the shop and then for some reason I got really motivated and started working at it again. Today Shane(ShaneLach), Sam my dad and I replaced the brakes and suspension.
Here are some pics I'm really lazy to type up what has been finished.
New work space for now.
First coat of primer was etching primer.
5 gallon's worth of oil and coolant, I have about 20 more 1qt bottles in the garage haha.
I hate you engine.
Purchased these last night with brand new rear rotors with SS lines for $460 still need to purchase an e-brake assembly though
2nd coat of gray primer.
I seen someone else use this on here and it came out really nice and glossy.
After about 2 bottles of the appliance paint now just waiting to clear it.
Before swap
After swap, you can't see it but I also installed my GR PRO+
Calipers needed a 5-10mm spacer I forget what size it was to clear the caliper, wheel specs are 17x7 +42 ordering some 20mm from PBM to soon fix the sinking ship.
I have the front mount mounted, just need to drill the holes. Sound deadner is the next thing for the interior to come out and then some type of sound deadner will replace it. Seats will be probably eBay knock offs or something not sure quite yet. Few things I have to do to the engine prior to dropping it is resurface the flywheel, order new flywheel bolts, replace rear main seal and most likely front main seal then its ready to drop in.