Hey guys havent posted in awhile, I was holding back some progress due to hopefully being done at xmas break, but it proved to be way too short of a time frame and I only could get a couple days work in. My time frame is hopefully in the spring when I can get back for more than just a bit, but I did get a guy to help with some of the main wiring.
My main to do list as of right now is:
1.Have to plug in the rest of the harness to everything, try and organize the existing little mess to clean it up and hide as much as possible (if anyone has pointers im all ears)
2.Dakota boxes so I can put the speedo and tach back in
3. Power steering lines need to be attached
4. Thottle Cable Line
5. Finish HVAC lines,
6. Find a place to mount the Filter relocator and run oil cooler lines
7. Random hoses for boostcontroller, wastegate, guages etc.
So basically im quite close
Anyways im not one for much talk so here's the pics!
Yes that is swaybar mount, happens to fit very nicely around the earl's filter
Mockups for stainless covers
Exhaust all finished up and in place
Tight fit forsure
Coverter Done
Slave Cylinder done after some random lines from Canadian Tire and Fittings haha, need some inspection plates still tho.
Made some room for the rad to sit nicely. Also the waterpump bolts had to be ground flat for it to fit :S
Wastegate chillin out
Fuel System all setup
Engine cover needed some tlc, the letters were suprising hard to get off, but the front just needed a blowtorch and a good supply of exacto blades.
Hows that for a party piece

This engine cover is gunna look sick, I promise.
Trunk all finished up
Fan setup
Interior pic as it sits right now, (bad quality) just chillin
All the piping on and whatnot
Stance... (ehemm..dont mind the hood not closed)
Om nom nom
As she sits currently
Im hoping everything goes smoothly, i want to tear the road up with this car
Kyle