Well, another week has passed, and then some. I have the fuel system finished and done and re-wired. I have the IC piping done and turbo mounted, still need to to the wastegate. The car is at the race shop getting some sheet metal work done, the 6pt cage will be done tomorrow and the hood cutout for the turbo will be done tomorrow as well. I am planning on picking it up after work and snapping some pics for everyone. Pretty much the last things i have to do are the WG and dump pipe, driveshaft loop, lots of wiring cleanup and clean the damn thing up and drive it, I am projecting that my work schedule this week will involve 7 days and lots of overtime, but if now, I should be driving it next weekend. Anyways, this is an update if anyone cares. Look for pics on here and/or on
http://www.ka-t.org tomorrow-ish.
Rick