Post by
S-14boy »
https://forums.nicoclub.com/s-14boy-u2378.html
Mon Feb 09, 2004 3:03 pm
Im in the middle of putting the kit on, I'm finally on the home stretch. Its take me about 2 weeks, cause some one at GReddy was F'in up. My kit came with 440cc injectors, was missing studs, and banjo bolt and fitting. Ive spent 12-15 hours lookin for a banjo bolt and fitting and got nothing, Im finally getting one overnighted from GReddy. And there was no instructions for the FMIC piping but figured it out in 3 days, and finding some one to weld aluminum was a biatch (for BOV flange). But its turning out good. Ill tell u when its runnin.