Post by
kenno470 »
https://forums.nicoclub.com/kenno470-u51775.html
Thu Jun 18, 2009 9:48 pm
Just got done with another long night in the garage...
Just a couple more hours and the wiring should be complete. Getting all these systems in place has been a real pain and makes me wish I had entered the Pikes Peak Open division, rather than Time Attack. No wipers, headlights, turn signals, or any of that crap. And I could run whatever tire I want instead of DOT's...I'm an idiot.
Saturday we will be finishing up the assembly and making notes for anything that might be missing or need tweaking. If any of you are available and can come lend a hand in getting these last bits finished up, you are welcome.
Looks like we will Dyno and test here in Texas with E85, but we'll be running E95 at the Hill Climb. A good friend of ours, my Quad engine builder John Stallworth, got us hooked up with the manufacturer and is picking up a drum for us on his way out to the Hill Climb.
Just 25 days till we tech at Pikes Peak.
Bye.