driveshafts

Discuss the RB20, RB25 and RB26 series engines.
rb250sx
Posts: 292
Joined: Wed Jul 16, 2003 4:32 pm
Car: '89 s13 w/ RB25DET
'07 Nissan Frontier
'14 Jeep Rubicon

Post

I was wondering for all you guys who did the 25 swap. where did you get your driveshafts made and how long did it take for them to make it. Did anyone go through an online company? Also did you have to hunt down the Z yolk yourself?


rb25240
Posts: 41
Joined: Sat Apr 24, 2004 9:06 pm
Car: 240sx

Post

I dont know your set-up but If you run a LSD you can use the 90-97 300zx n/a driveshaft with the same LSD without doing a stepo down in the driveshaft. It would make things easier if your going to do them both anyway. I got the yolk with the driveshaft I pickd up and Im getting the work done by a guy here in Omaha. As far as online a place though... I dunno.

Joe
Posts: 6511
Joined: Sun Feb 09, 2003 8:29 pm
Location: Phoenix, AZ

Post

hmm...you sure about that? i would think the length on a 300zx shaft would be diffrent.

User avatar
krayton
Posts: 1090
Joined: Tue Jun 24, 2003 11:10 am

Post

i got my built at a 4x4 off road driveshaft place. I had a bunch of places in town, but they offered the cheapest.

it took 24 hours for them to make it too

and with the yolks, you can count the splines and run through a list with a hot rod shop or something. i went this route for a larger and stronger yolk


Return to “RB20DET / RB25DET / RB26DETT Forum”