marleyfan wrote:Not quite seeing how this thread is relevant to the Versa.
Not quite seeing how this post is relevant to this thread. Here's an idea, don't read it if you don't care. Problem solved.
superskunk wrote:work over rigs do work overs, changing the type of well from say injection to producer or viceversa.... however production rigs are mainly well servicing rigs, the 2 rigs are the same no difference except job tasks.... ive been in the industry for about 4 years on and off... we also do the completions, those are the best sometimes, lots of a$$ time.... lol... do you run gyro survey tools?
I gotcha. We do run gyros in one of our fields due to the need to drill directional wells because of surface issues. It's a mature field, and it's being drilled down to pretty close spacing, but there's usually some surface problem (pond, house, etc) that keeps us from placing a well where we want it - so we drill from another pad and steer it to the bottom hole location we want.
The primary field that I preside over is young and we haven't had to drill directionally...yet.