Post by
ILikeMy240sx »
https://forums.nicoclub.com/ilikemy240sx-u16757.html
Thu Mar 22, 2007 1:21 pm
First of all, lube everything with ARP lube. Including the threads, washer, nuts.
you get an allen wrench that fits the stud, install the studs using the allen wrench and tighten it down until you feel it bottoms out.
You install the washer and nuts.
tighten according to the FSM sequence (inside out) but tighten them in 20 ft*lb increments until 75 ft*lb.
So, your first sequence is 20ft*lb then, 40, then 60, then 75.