Post by
pejsa s-13 »
https://forums.nicoclub.com/pejsa-s-13-u106385.html
Tue Mar 23, 2010 4:38 pm
so me and a buddy started the 3 link today made awesome progress
the lower link bars
the upper wishbone link so far
the lower link installed
the brackets on the pumpkin
the new crossmember
all i need now is two more link end bushings, grade 8 bolts, install my driveshaft, brake lines, weld the upper link together, cut the bed, and but the coilovers lol lots left