Really really excited about this weekend! I have the motor and tranny mounted up, and the last parts I was waiting on have arrived. The only thing left for me to get will be a driveshaft and a battery! I will be picking up a battery this weekend, after I get everything else situated.
Last weekend I got a good bit of work done on her. Finally got to hang the exhaust because my Circuit sport hanger bushings came in. Mounted up an A'pexi GT SPEC. This thing is huge! 3.75in. piping with a 4.5in. outlet! Normally I'd say it's ridiculous, but I've got a good bit more displacement, and at some point I'll be going FI, so it'll do the trick!
Also, I cut the transmission tunnel to make room for the shifter. I still need to grind a hair more clearance into it, but it's pretty close.
Here's my buddy Arty making the first cut on the tunnel
Without the shifter bracket:
With the shifter bracket:
Also, here are all of the goodies that came in this week.
List goes like this:
Weld-in O2 bungs
JWT PopCharger w/heat shield and a Z1 Motorsports polished intake pipe
AMS lightweight idler pulley and alternator pulley
Taylor battery relocation kit with install kit
Ah, toys
I'm hoping to get a start up video by the end of the weekend. It will be open header and loud as all hell haha. 2 more weeks and I'll have a driveshaft and a y-pipe so the next video will be on a dyno!