Post by
doctorchee »
https://forums.nicoclub.com/doctorchee-u41751.html
Sat Sep 05, 2009 10:06 pm
scary how fast time is. about 1year + since i last posted
well, still going slow to complete it.
reason:1) work get really too busy2) going to get married and $$ is limited a lot recently 3) many problems appear along the way4) got myself a bmw e36 compact (still original haha) for daily driving and this take up lots of budget again.
however, things below is done further:1) Quarter master 3plate clutch installed into the VH41/RB25 box set up2) Hydralic clutch throw out bearing conversion - with mechanical TOB, clutch peda too hard, however, changing to hydraulic doesn't help much either... 3)wilwood full floor pedal - clutch, doule master brake pump, gas pedal4) extra roll cage with X cross member bar undercarriage5) brakes caliper - Wilwood -F6pots, R4pots
upcoming work:1) to install a electrical turbo oil return pump - smoking now as return pipe is difficult to have a high point due to some stupid angle2) rewire the ECU as some wiring has to touch up3) change radiator electrical fan - current one think almost dying4) wrap up those intercooler piping with heat shield etc5) Hit dyno
new estimation date of completion will be year end 2009. hope can get it done in time.
just some update, project is not dead. still struggling and still VERY DETERMINE to complete it no matter what it takes!!
good luck guys with your project.
CheersDerrick